Honeycomb

  Honeycomb

Honeycomb Rectification

Honeycombs are hollow spaces and cavities left in concrete mass on the surface or inside the mass where concrete could not reach. These look like honey bees nest (Figure 8.4). Improper vibration and workability of concrete are main causes of honeycombs in concrete.


Figure 8.4. Honeycomb

After removal of formwork, loose particles were removed from honeycomb to achieve sound substratum. If necessary cutting around affected area, care to be taken to not disturb the hardened concrete. While cutting, only around the boundary of the affected area should cut down. Then, the concrete surface which were affected by honeycomb was cleaned by using compressed air to be free from dust, cement laitance and grout deposits. After that, bonding agent (Barra emulsion) was applied to concrete surface. 

 Then, non-shrinkage grout (MasterFlow 810) in trowellable stage was applied to surface defects from 5 mm to 40 mm in a small area. If honeycomb identified as a severe damage up to rebar exposure, grouting should be done with outer formwork.

 

Outer Formwork for Honeycomb

Affected area was selected by outer line and 4 mm thick 50mm – 100mm wide sponge sheet layer was laid along that outer line using adhesive. After that, bonding agent was applied to affected area and plywood board piece was nailed to concrete member to have sufficient top opening to pour the grout from top side (Figure 8.5). Immediately after fixing the formwork, non-shrinkage grout in self flowable stage was poured.

Flowable stage: 4.5 liters of water for 25 kg bag

While continuing the pouring, hammering was done by rubber hammer to have proper filling.

Any foreign aggregate should not be mixed with the grout for lager honeycomb rectification. For lager honeycomb deeper than 50 mm at vertical surface and top horizontal surfaces Mapefill 06 – shrinkage compensated, super flow micro concrete was used (Figure 8.6) Outer formwork was removed after 24 hours from the casting time and cured using MASTERKURE 128 (Figure 8.7)


              Figure 8.6.Mapefill 06    Figure 8.5.Outer formwork  Figure 8.7.Micro Concrete

  